From Site Design to Live Operation

AMAX supports planning, design, integration, commissioning, and production readiness.

HostMax™ extends beyond hosting. AMAX works with customers and partners across the full path of AI infrastructure delivery, including site planning, facility design, rack-level system builds, power and cooling preparation, commissioning, and production readiness. For organizations building dedicated AI environments, including multi megawatt deployments, AMAX provides an engineering-led path from concept to production.

Turnkey AI Data Center Engineering & Delivery Framework
AI Data Center Core Phases

Phase 01

Capacity Planning & Site Feasibility

Collaboration with customer teams defines the critical parameters of the AI infrastructure. AMAX establishes target capacities, rack densities, power envelopes, cooling strategies, spatial requirements, phased growth models, and deployment schedules for 2MW to 50MW+ projects.

Key Deliverables
  • Feasibility Studies
  • Utility Power Scaling Roadmaps
  • TCO Models
Phase 02

Facility & MEP Engineering

AMAX architects specialized physical environments for high-density AI workloads. This includes designing mechanical, electrical, and plumbing (MEP) infrastructure, power distribution, liquid cooling loops, airflow management, cable pathways, and integrated monitoring systems.

Key Deliverables
  • Cooling Schematics
  • Power Path Designs
  • Facility Layout Blueprints
Phase 03

AI Rack & Cluster Architecture

AMAX defines complete rack-level architecture, integrating GPU/CPU servers, networking, storage, PDUs, liquid manifold connections, management interfaces, and structured cabling for high-performance AI clusters.

Key Deliverables
  • Rack Elevation Drawings
  • Network Topology Maps
  • Cable Labeling Schematics
Phase 04

Factory Build & Pre-Site Validation

To eliminate deployment delays and minimize on-site risk, AMAX pre-builds and validates infrastructure within controlled integration facilities or HostMax™ environments. Racks are fully integrated, cabled, labeled, and subjected to rigorous Factory Acceptance Testing (FAT) before shipment.

Key Deliverables
  • Plug-and-play rack-scale systems
  • Factory Acceptance Testing (FAT)
  • Comprehensive factory test reports
Phase 05

Site Installation & Level 1–5 Commissioning

AMAX manages the physical deployment and comprehensive Level 1–5 commissioning of the data center. This includes verification of power delivery, cooling loop pressures, network fabrics, control systems, and failover procedures under simulated peak AI workloads.

Key Deliverables
  • Integrated Systems Testing (IST)
  • Workload validation reports
  • Operational readiness certification
Phase 06

Production Handoff & Lifecycle Operations

AMAX ensures a seamless transition from construction to production AI operations. The engagement includes complete documentation, operational training, monitoring integration, preventive maintenance planning, spare-parts logistics, and ongoing engineering support for future capacity expansion.

Key Deliverables
  • As-built documentation
  • Standard Operating Procedures (SOPs)
  • Long-term operational continuity plans

HostMax™ Start Now, Build in Parallel

Need to train your AI models today, but your dedicated data center is still 18 months away?

With AMAX, you don’t have to wait. We can host and run your immediate high-density AI workloads within our established HostMax™ facilities today, while our engineering team simultaneously designs, builds, and commissions your custom, dedicated multi-megawatt site. Once your facility is live, we execute a seamless, zero-downtime transition.

Contact Us to learn how AMAX can help you deploy high-density AI infrastructure with efficiency, reliability, and scalability.